N. 95TH RECONSTRUCTION
JUNE 2017- January 2018, VALUED: $1,562,000.00
Scope: Full Depth Reclamation of section
Contact: Dan Delange
6040 FOURMILE CANYON WALL
MARCH 2017, VALUED: $115,959.00
Scope: Wall installation and grading
Contact: Matt Betz
DAVIS LANE PARK POND DREDGING
MARCH 2017- May 2017, VALUED: $194,701.00
Scope: Muck excavation
Contact: Matt Knight
FRICO 160TH & WASHINGTON ST
DECEMBER 2016 - April 2017 VALUED: $565,637.00
Scope: Box Culvert Extension
Contact: Scott Wenger
NCAR BEAR CANYON & MESA ROADS
NOVEMBER 2016 - December 2017, VALUED: $776,000.00
Scope: Repairs on an administrative access dirt/gravel road, - serves as public hiking trail in connection to Wildwood Rd.
Contact: Greg Seabloom
S. DENVER AVE WIDENING AND RESURFACING
JULY 2017- September 2018 VALUED: $1,448,000.00
Scope: Widening Rd and resurfacing
Contact: Roy Vestal
RECREATION TRAIL SEGMENT 10C
OCTOBER 2017- March 2018, VALUED: $332,097.00
Scope: Building new pedestrian and bike trail
Contact: Kelley Smith
Arvada leyden creek trail bridge
november 2016 - february 2017, VALUED: $156,130.00
Scope: Furnish and intall 30' span pedestrian bridge, signage removal of willow trees, seeding and potholing.
Contact: Matt Knight
720-898-7660 mknight@arvada.org
crawford Gulch retaining wall
May 2016 - April 2017, VALUED: $2,418,244.44
Scope: Install retaining wall and slope repairs to Crawford Gulch Rd.
Contact: Mike Dobbs
303-271-8564 mdobbs@jeffco.us
flat irons golf course
march 2016 - july 2016, VALUED: $467,462.00
Scope: Demolition of Event Center, alterations of Grill and construction of grill storage shed. Installation of Trail restroom, paving and utilities.
Contact: Mike Lamb
303-413-7225 LambM@BoulderColorado.gov
KNOLLWOOD TENNIS COURT - BOULDER, CO
SEPTEMBER 2015 - CURRENT, VALUED: $293,900.97
Scope: Renovate two tennis courts, wood wall demo and reconstruction, tennis court surfacing and concrete slab, earthwork.
Contact: Mike Lamb
303-413-7225 LambM@BoulderColorado.gov
BEAVER BROOK RETAINING WALL
OCTOBER 2015 - COMPLETED, NOVEMBER 2015. Valued: $ 204,360.00
Scope: Slope excavation, redi rock block MSE installation 1200 SF, drainage system.
Contact: Rick Beck
303-569-3251 rbeck@co.clear-creek.co.us
GOLDEN GATE state park - GOLDEN, CO
jUNE 2015 - COMPLETED, NOVEMBER 2015. VALUED: $ 1,444.386.50
Scope: Parking lot improvement, subgrade stabilization, aggregate base course, earthwork, shoulder repair.
Contact: Paul Barker
1-970-491-5031 paul.barker@state.co.us
EBEN G. FINE PARK- BOULDER, CO
nOVEMBER 2015 - August 2016, VALUED: $ 438,598.40
Scope: Stream bank stabilization, 85 ton of boulder installation, sand stone steps, irrigation system installation, seeding.
Contact: Katie Knapp
303-441-4077 knappk@boulderco.gov
Town of Jamestown Emergency Stream Restoration, Federal NRCS / EWPP Project
March 2014 – Completed, Summer 2014. Valued: $927,000.00
Scope: Approximately 2 miles of stream / river emergency restoration to protect the Town of Jamestown from future flooding. River re-alignment, channeling, grading, toe-wall and rip rap bank stabilization, road re-alignment, culvert & bridge repairs, and vegetation. Import 7000 tons of granite, completed survey, debris removal, tree removal, and all construction activities to complete entire stream corridor. Substantially completed on time.
Contact: Graeme Aggett PHD, Lead Engineer AMEC
303-217-1753Email: Graeme.Aggett@amec.com
Contact: Tara Schoedinger, Mayor of Town of Jamestown
303-731-9269Email: mayor@jamestownco.org
Golden Gate State Park Mountain Base Road Repair
Lat: 39°51'42"N - Long: 105°26'46"W
October 2014 Current,ValueD: $347,000.00
Scope: Installation of three gravity wall sections, guardrails, and signage along Mountain Base Road at the Golden State park in Colorado. Includes excavation, balding and shaping, surveying, geotextile installations, seeding and erosion control fabrics, gravity block retaining wall installation (a Redi Rock System).
Contact: Gene Potter, Design Engineer, Colorado Parks & Wildlife
303-291-7315 Email: gene.potter@state.co.us
EVERT PIERSON KIDS FISHING PONDS
Boulder Creek Path BOULDER, COLORADO
OCTOBER 2014 - november 2014 – CUrrent, VAlUED: $380,805.88
Scope: Pond reconstruction, Plant and wildlife restoration, replacement of damaged fishing docks and bridges, resloping/grading, and earthwork, dock construction
Contact: Michael Lamb, RLA, Parks Project Manager, City of Boulder
303-413-7225 Email: Lambm@bouldercolorado.gov
Contact: Doug Godfrey, Parks Planner, City of Boulder Parks and Recreation Development
303-413-7200 Email: Godfreyd@bouldercolorado.gov
Cedar Creek and Road Improvements
Completed, Valued: 350,000.00
Scope: Installation of pre-cast box culvert and usage of an earth-filled cofferdam to divert creek water.
Contact: Dave Buttles, Operations Manager 303-872-5233
Contact: Town of Montrose, Colorado, Purchaser 970-240-1480
Design/Build, Bridge Replacement Project, Evergreen, CO.
September 2014
Current, Valued: $50,000.00+
Scope: Structural Engineering and Construction of pre-cast concrete culvert and Redi Rock wing wall bridge. Hydrology engineering analysis of creek flow under bridge destroyed by flooding. Structural analyses and engineering, Redi Rock retaining wall rock protection system, and construction of both bridge and walls.
Contact: Joel Ambrosino , P.E. , Gebau Engineering
303-444-8545 Email: joel@gebau.com
Contact: John Hall, Owner
615-715-4346 Email: johnh6975@gmail.com
8398 Left Hand Canyon, Boulder
August 2014 – Completed November 2014, Valued: $50,000.00
Scope: Hydrologic Engineering and planning, including 404 Permitting, and Flood Development Permitting. Construction involving Private Creek Restoration, Toe Wall Construction, Rip-Rap Bank Stabilization, and Wetland Revegetation.
Contact: John Winchester, Hydrologic Engineer
303-258-3567 Email: jwinchester@highcountryhydrology.com
Jeff Crane, CWBG Grant Engineer
970-261-5043 Email: jeff@craneassociates.net
112 Bow Mountain Road, Boulder, CO
Completed Summer 2014, Valued: $150,000+
Scope: Slope stabilization project adjacent to residence due to a substantial landslide incurred during the heavy rains and flooding of 2013. Project included removal and offsite disposal of debris and sediment from landslide and construction of pioneered slope road, a 150’ tall retaining wall that included the import and placement of over 1600 tons of rock form the Left Hand Canyon area of Boulder. Temporary road construction and placement of riprap and boulders was also utilized to complete this project.
Contact: Frank Harrison, Principal Geotechnical Engineer 303-877-7178
email: fharrison@m-west-assoc.com
Ben Day, Owner 720-938-4514 email: ben@ben-day.com
1213 17th Street, Boulder CO
Completed, Spring 2014,
Valued: $75,000
Scope: Slope stabilization project located at 1213 17th Street, adjacent to Boulder Creek. Colt & Steel has worked with the City of Boulder to obtain the necessary ROW Permitting and Army Corps Permits needed to work in the wetlands area. This is a slope stabilization project in which a retaining wall will be constructed to mitigate future damage obtained from the 2013 flood and to secure slope failure below the 1213 17th St. residence. Import of native rock boulder over 4-6’ in diameter, temporary culvert and equipment crossing over Boulder Creek, and drainage systems behind wall areas. Debris, tree removal and river realignment.
Contact: Frank Harrison, Principal Geotechnical Engineer 303-877-7178
Email: fharrison@m-west-assoc.com
Contact: CPWest Architects, Owner 303-478-4704 email: cpwest2@gmail.com